Text only view
Oregon.gov Licenses, Permits and Registrations
Department of Consumer & Business Services
Detailed Information for: Electrician, Limited Renewable Energy Technician (LRT)
     Not the license you were searching for?
Click here to continue searching within the Oregon Licenses, Permits & Registrations directory.
 
Updated: 6/17/2014
Description: This license allows the holder to install, maintain, replace, or repair electrical wiring and electrical; products that convey or operate on renewable electrical energy not exceeding 25 KVA, according to the requirements of ORS 479.630.


Similar Keywords: electricians
Statutes, Rules, Ordinances: OAR 918-282
http://www.oregonlegislature.gov/bills_laws/lawsstatutes/2013ors479.html
Duration: 3 years or less, depending on the date of issue.
Fees - application, exam, etc.:  $50.00 application fee. The application fee includes the first license cycle after passing the examination. All application fees are
non-refundable.
Responsible Agency: BCD - Electrical
Examination Information: Applicants approved to take an examination will be sent a "Letter of Authorization." This letter will explain the procedure for taking the examination and the address and telephone number of the test site selected.

Examination date and time is scheduled by the applicant with the test site office personnel. Upon arrival at the test site, the applicant must provide photo identification and a Letter of Authorization. If the examination is not taken within 60 days of the date of the authorization letter the applicant must submit a re-application form with the appropriate fee to schedule another exam date.

If the applicant fails the exam they may re-apply at anytime and test no sooner than 30 days after each failed exam.

Applicants are requested to bring their own pencils and calculator; scratch paper will be provided. Programmable calculators and laptop computers are not permitted.

Please allow two weeks for Building Codes Division to grade exams. Do not contact the test location for grade results. The Building Codes Division will mail notification of grade results to the applicant. Licenses will be issued after the applicant has passed the examination.

Limited Renewable Energy Technician: Open-book examination: 28 multiple-choice questions (two-hour time limit).

Only the following materials are permitted for OPEN-BOOK examinations:
  • Current NEC Book
  • Current Oregon Electrical Specialty Code
  • Current NEC Handbook
  • Tom Henry Key Word Index
  • Ferm's Fast Finder Index
  • Ugly's Reference
  • American Electrician's Handbook
  • Oregon Administrative Rules
  • Oregon Revised Statutes

Licensing and Certification Examination Process
Continuing Ed Requirements: During Each three-year license period, all licensees shall compete a minimum of 4 hours of approved code change continuing education, unless otherwise directed by the board. Please see the Electrical Calendar at Training & Continuing Education
Bonding Requirements: None
Insurance Requirements: None
Prerequisites: Follow the requirements outlined in OAR 918-282-0205for general licensing criteria.
A. Complete a two-year apprenticeship program as outlined in ORS 479.630 and OAR 918-282-0205OR,
B. Provide verifiable proof acceptable to the division of equivalent experience as outlined in ORS 479.630 and OAR 918-282-0205 (3).
C. Submit proof of classroom training as outlined in OAR 918-282-0205.
E. Pass a written exam.
Application Form: Electrical License Application
Renewals: Renewal fee is $50. A renewal notice will be mailed to the licensee approximately six weeks prior to the expiration of their license. Current cycle expires 10/1/2014. 
Service Links:  Download Application Instructions
 Download Application Form
 Download Experience Verification Form
 General Licensing Information
 BCD Main License Search
 Online Application Form
 Online Renewal Form
 Change Of Address
 Online Duplicate License Form
contact Agency Contact Information
Required Documentation: Attach documents to support experience qualifications.
Additional Information: Restriction:
Licensee must be employed by a limited renewable energy contractor or an electrical contractor.

  Agency Information
Please refer to the Agency Website for further details and additional information.
Agency Name: BCD - Electrical
E-mail Address: License.BCD@state.or.us
Phone: 503-373-1268
Mail Address: DCBS - Building Codes Division
PO BOX 14470
Salem, OR 97309 - 0404
Website Information: http://www.bcd.oregon.gov/programs/electrical.html

Return to the Licenses, Permits and Registrations main page
_
Website Policies  |  Licenses, Permits & Registrations Home  |  Oregon.gov